BEFORE & AFTER 11.jpg
13 of 34
The main bathroom was rejuvenated with a new mirror and light fixture. The base cabinet was painted and new hardware was installed. The flooring was replaced with the same peel and stick tile as the kitchen.
The main bathroom was rejuvenated with a new mirror and light fixture. The base cabinet was painted and new hardware was installed. The flooring was replaced with the same peel and stick tile as the kitchen.